Commercial Projects

Sign up to the Newsletter

3 Point Build - Contact Us

Commercial | Commercial Projects | Mezzanine Floor

3 Point was engaged by Allstate Linemarking Services to build a Mezzanine Floor in their factor at Yatala. The mezzanine floor measured 50m2 and was completed in just 2 days. The flooring used was 22mm structual flooring with 200mm x 63mm LVL's glued and nailed down with was attached to structural steel posts and beams.